Uncategorized

Bioreactor Pid Sketch: Bioreactor P&ID Sketch and Performance Requirements

openbookpros 2 min read

Need this essay written? Get a free quote from a subject specialist in minutes.

Order Your Essay
Module VOMP3011 From URS to PQ – A Practical Validation Strategy
Institution TU Dublin (online delivery with GetReskilled)
Task P&ID-1 Bioreactor, Rev 006
Parts Step 1-1 P&ID sketch; Step 1-2 performance requirements

VOMP3011 students in Irish biopharma start their validation project with this bioreactor P&ID. The drawing must show the vessel, jacket, agitator and outlet pump plus fourteen named lines covering aeration, venting, CIP, SIP, media, inoculum, antifoam, acid and base dosing and jacket thermal fluid, followed by a short list of the bioreactor’s main performance requirements.

P&ID-1: Bioreactor

Step 1-1: Sketch the bioreactor P&ID

Sketch a basic P&ID for a bioreactor with the following main equipment components (your sketch can be hand-drawn or done using a basic software drawing package):

  • Bioreactor vessel, with heating and cooling jacket
  • Bioreactor agitator
  • Bioreactor bottom outlet pump

Include the following process and utility connections on your P&ID:

  1. Aeration supply to the bioreactor
  2. Aeration vent/exhaust from the bioreactor with pressure control
  3. CIP manifold supply to the bioreactor
  4. Inoculum supply to the bioreactor
  5. Media supply to the bioreactor
  6. Clean steam supply to the bioreactor for SIP
  7. Contaminated condensate (SIP) return
  8. Process water supply and return distribution to and from the bioreactor
  9. Over-pressurisation vent line to a catch tank via a rupture disc
  10. Antifoam addition
  11. Acid addition to the bioreactor for pH control
  12. Base addition to the bioreactor for pH control
  13. Bioreactor bottom outlet via pump to the harvest process manifold
  14. Thermal-exchange fluid supply and return to and from the bioreactor’s heating and cooling jacket (from a temperature control skid)

Step 1-2: Performance requirements

List the primary performance requirements associated with a bioreactor. Write a sentence or two to expand on each of your performance requirements.

Get Expert Help with the VOMP3011 Bioreactor P&ID

Draw the main equipment first, then add the utilities in groups (gas, clean utilities, additions, outlet and jacket loop) so that no connection is missed and valves and instruments sit in sensible places. For Step 1-2, write each performance requirement so that it can later be tested, for example temperature, pH, dissolved oxygen, sterility and cleanability targets.

Our technical report writing help can support the written requirements, and our university assignment help covers pharmaceutical engineering modules. Students in Dublin can also use our assignment help in Dublin.

The post VOMP3011 P&ID-1 Bioreactor Assignment: Sketch 14 Process and Utility Connections and Performance Requirements (TU Dublin) appeared first on Ireland Assignment Helper.

You can also explore more resources on our website.

Plagiarism-Free Essay Writing

Have This Essay Written By a Professional — On Your Terms

  • Verified writers, vetted by subject
  • 100% plagiarism-free — Turnitin report included
  • Deadlines from 3 hours
  • Unlimited free revisions
  • Free quote — no card required
  • Money-back guarantee

No credit card · No commitment · Quote in minutes

Share: X Facebook LinkedIn WhatsApp
openbookpros Academic Writer & Editor